In 2008 Premier commissioned a new inspection facility.
3 Off Beds of sizes 6m x 2m, 4m x 2m and 2.5m x 2m all with Stielfmayer's running a new inspection software system Delcam Power Inspect
This is in addition to inspection area's within the rest of the group.